About:St. Louis Metro/service change/6-12-2017

From Transit.Wiki
< About:St. Louis Metro
Revision as of 17:27, 1 June 2019 by Andy (talk | contribs) (Text replacement - "Provider" to "Parentpagename")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

St. Louis Metro 6-12-2017

Metro Quarterly Service Change Set for June 12

Adjustments to four MetroBus routes will go into effect on Monday, June 12, as part of the quarterly service change for the Metro transit system.

Metro regularly monitors and reviews feedback from riders and bus operators. This information, along with other trip data, allows Metro to update bus routing and schedules to improve on-time performance and connections to MetroLink.

Details of Quarterly Service Change effective Monday, June 12:

1 Gold: Route adjustment; all trips will serve Forsyth and Skinker Boulevards. Route will not serve Hoyt and Brookings Drive due to construction. Passengers can board #1 Gold at the stop located at intersection of Forsyth and Hoyt.

2 Red: Route adjustment; all trips will serve Forsyth and Skinker Boulevards. Route will not serve Hoyt and Brookings Drive due to construction. Passengers can board #2 Red at the stop located at intersection of Forsyth and Hoyt.

Green Line: Route adjustment; all trips will serve Forsyth and Skinker Boulevards. Route will not serve Hoyt and Brookings Drive due to construction. Passengers can board Green Line at the stop located at intersection of Forsyth and Hoyt.

40 Broadway: Route adjustment; Due to construction, route will not serve 7th Street. Passengers can board southbound trips at Broadway and Washington Avenue, and can board northbound trips at 4th Street and Washington Avenue.

For more information, contact Metro Customer Service between 7:30 a.m. to 4:30 p.m., Monday through Friday, at 314-982-1406 or 618-271-7879.