Carquinez Bridge

From Transit.Wiki
Revision as of 19:33, 9 November 2017 by Andy (talk | contribs)
Loading map...

I-80.svg

The Carquinez Bridge links Vallejo in Solano County with Crockett in Contra Costa County.

The current base toll is $5, charged in the northbound direction only (no toll southbound). Carpool vehicles with 3 or more persons can cross the bridge for $2.50 on weekdays between 5am - 10am and 3pm - 7pm. FasTrak is accepted for payment.

Carquinezbridge.jpg

Bikes and pedestrians

A bicycle/pedestrian trail is available on the west side of the suspension bridge.

Transit

Over the Bridge

[[SolTrans Green Line|Green Line: Fairfield - El Cerrito del Norte Station]]
[[SolTrans Red Line|Red Line: Fairfield - Vallejo - El Cerrito del Norte Station]]
[[VINE Route 29|Napa BART Express: to/from El Cerrito del Norte BART]]

Alternatives