Difference between revisions of "Los Angeles Metro Rail E Line"

From Transit.Wiki
m (Text replace - 'format=googlemaps2|width=100%|height=500|kml=' to 'format=googlemaps|width=100%|height=500|gkml=')
m
Line 1: Line 1:
 
[[Los Angeles Metro Rail|Metro Rail]] {{MTAlines|expo|y}} is the newest [[light rail]] line in Los Angeles region. It follows a Pacific Electric corridor which discontinued passenger service back in the 50s. It is scheduled to open on April 28, 2012. However, two of the stations will not be ready for service on that date but are scheduled to open in the summer.
 
[[Los Angeles Metro Rail|Metro Rail]] {{MTAlines|expo|y}} is the newest [[light rail]] line in Los Angeles region. It follows a Pacific Electric corridor which discontinued passenger service back in the 50s. It is scheduled to open on April 28, 2012. However, two of the stations will not be ready for service on that date but are scheduled to open in the summer.
  
Expo line trains will run run every 12 minutes. This line uses [[Proof of payment]] fare system.  
+
: [http://www.metro.net/riding_metro/bus_overview/images/806.pdf Schedules]
 +
 
 +
Expo line trains will run run every 12 minutes daily during the day and every 20 minutes at night until about 12:30am. This line uses [[Proof of payment]] fare system.  
  
 
At 7th Street/Metro Center in downtown, it connects with Metro {{MTAlines|red|y}} and {{MTAlines|purple|y}}. At Pico Station, it connects with Metro {{MTAlines|blue|y}} line.
 
At 7th Street/Metro Center in downtown, it connects with Metro {{MTAlines|red|y}} and {{MTAlines|purple|y}}. At Pico Station, it connects with Metro {{MTAlines|blue|y}} line.
 +
 +
Farmdale and Culver City stations are under construction/testing and will open at a later date.
  
 
==Line and stations==
 
==Line and stations==

Revision as of 23:05, 23 April 2012

Metro Rail E Line is the newest light rail line in Los Angeles region. It follows a Pacific Electric corridor which discontinued passenger service back in the 50s. It is scheduled to open on April 28, 2012. However, two of the stations will not be ready for service on that date but are scheduled to open in the summer.

Schedules

Expo line trains will run run every 12 minutes daily during the day and every 20 minutes at night until about 12:30am. This line uses Proof of payment fare system.

At 7th Street/Metro Center in downtown, it connects with Metro B Line and D Line. At Pico Station, it connects with Metro A Line line.

Farmdale and Culver City stations are under construction/testing and will open at a later date.

Line and stations

<simpletable sep=comma cellspacing=0 cellpadding=0> align=right colspan=2| Station/stop names, , Connections align=right colspan=2| 7th Street/Metro Center,Stnstart.png, B D align=right colspan=2| Pico,Stn.png, A align=right colspan=2| 23rd Street,Stn.png, align=right colspan=2| Jefferson/USC,Stn.png, align=right colspan=2| Expo Park/USC,Stn.png, align=right colspan=2| Expo/Vermont,Stn.png, align=right colspan=2| Expo/Western,Stn.png, align=right colspan=2| Expo/Crenshaw,Stn.png, align=right colspan=2| Farmdale,Stn.png, to open later align=right colspan=2| Expo/La Brea,Stn.png, align=right colspan=2| La Cienega/Jefferson,Stn.png, temporary terminus align=right colspan=2| Culver City,Stnend.png, to open later </simpletable>

Map

Loading map...