Los Angeles Metro Rail E Line

From Transit.Wiki
Revision as of 01:15, 22 April 2012 by Andy (talk | contribs) (Text replace - 'format=googlemaps2|width=100%|height=500|kml=' to 'format=googlemaps|width=100%|height=500|gkml=')

Metro Rail E Line is the newest light rail line in Los Angeles region. It follows a Pacific Electric corridor which discontinued passenger service back in the 50s. It is scheduled to open on April 28, 2012. However, two of the stations will not be ready for service on that date but are scheduled to open in the summer.

Expo line trains will run run every 12 minutes. This line uses Proof of payment fare system.

At 7th Street/Metro Center in downtown, it connects with Metro B Line and D Line. At Pico Station, it connects with Metro A Line line.

Line and stations

<simpletable sep=comma cellspacing=0 cellpadding=0> align=right colspan=2| Station/stop names, , Connections align=right colspan=2| 7th Street/Metro Center,Stnstart.png, B D align=right colspan=2| Pico,Stn.png, A align=right colspan=2| 23rd Street,Stn.png, align=right colspan=2| Jefferson/USC,Stn.png, align=right colspan=2| Expo Park/USC,Stn.png, align=right colspan=2| Expo/Vermont,Stn.png, align=right colspan=2| Expo/Western,Stn.png, align=right colspan=2| Expo/Crenshaw,Stn.png, align=right colspan=2| Farmdale,Stn.png, to open later align=right colspan=2| Expo/La Brea,Stn.png, align=right colspan=2| La Cienega/Jefferson,Stn.png, temporary terminus align=right colspan=2| Culver City,Stnend.png, to open later </simpletable>

Map

Loading map...